Canal construction

Canal construction

Braumann has also been active in sewer construction since the mid-1960s. In the beginning, we still build main and secondary collectors in the cut-and-cover method. But Braumann soon enters the pipe jacking, whose technical procedures also allow underground crossings. The enormous progress in locating- and control-technology since the 2010s enables the installation of gravitational lines in horizontal directional drilling - depending of course on the respective geology, the prescribed pipe diameter and the required slope.

The procedures:

Canal construction

Sp├╝lbohrung ABA Eugendorf BA 13, Baulos 02
St. Marienkirchen ABA BA 13 + WVA BA 05 + Eggerding WVA BA 01, Bl 01
Vollschnitttechnik DN 1600, DN 2400
ABA Antiesenhofen BA 07 Bl 01