Project: ABA + WVA Wernstein BA 13 + A 05, Umbau Bahnhof Wernstein
Project description: Leitungsumlegungen entlang der Bahntrasse, welche im Zuge des Bahnhofsumbau Wernstein notwendig werden.
Contractor: Gemeinde Wernstein
4783 Wernstein am Inn, Innstraße 1
Engineering office: Warnecke Consult Ziviltechniker GmbH
4221 Steyregg, Weißenwolffstraße 14
Site manager: Martin Luger
Construction time: 11/2017- continously (12/2020)
Purpose: Water supply
Sewage disposal
Dimension: DN 100 mm to DN 500 mm
Technology:
Combined construction Horizontal directional drilling 
500 m
Cut-and-cover method 
1290 m
   
Geology: Solid rock